  • Adaptation to the new rules of the road to No. 6 level crossings on the railway line Adria / Mestre;
  • Centralization turnouts with adjustment ACEI railway yard Dinazzano;
  • Supply and installation of railway crossing and V301 line, high speed interconnections Bologna / Milano;
  • Delivery of ACEI of the new railway station of Trento Roncafort includes the supply and installation of the block axle counter analog Trento Mezzocorona;
  • Supply and installation of the block axle counter analog Mezzocorona in Bolzano, including the adaptation of the cabin;
  • Supply of No. 5 level crossings on the railway line Casalecchio / Vignola;
  • Provision of facilities for Acei I019 stations Emilia R., S. Lazzaro and Bagnolo in piano, and sound system, heating and telephone exchanges including level crossings V301 in railway FER;
  • Fair booths for SCMT, railway line Parma / L. Spezia line and Verona – Brescia – Vicenza and Torino compartment;
  • Supply and installation of heating exchange stations: Bazzano, Via Lunga and Crespellano;
  • Installation of a system SCMT railway line Modena / Suzzara and Porretta / Pistoia;
  • Construction planning and adjustments to the cabin on the Functional Bergamo – Rovato;
  • Adaptation to the new rules of the road to No. 20 level crossings;
  • Acei (centralized apparatus electromechanical route) of Tradate to V401;
  • Provision of detailed design and execution of plant modifications Acei of Gemona del Friuli, Carnia and Pontebba for the realization of the regime TP / EDCO;
  • Construction of a plant ACEI (centralized apparatus electromechanical route) at the station of Barco (R.Emilia);
  • Carrying out work on the square for IS systems and TLC phase ACE and new ACEI stations Poggio Rusco and Ostiglia.
  • Exhibition booth of ACEI Fortress, The Cave and Freienfeld;
    Installation and set-up cabin with 16 level crossings V301, laying 46 km. channeling and adapting
  • equipment cabin and yard in the railway line Ferrara / P. Rusco;
  • Supply and installation of the BCA is Collesalvetti / Vada;
  • Adjustment made for SCC and adjustment square to V401 stations: M. Pisano, Sarzana, Arcola, Vezzano, L. Spezia Migliarina and S. Stefano Di Magra;
  • ACEI system 016 of Umbertide;
  • Realization of the apparatus ACEI (centralized apparatus electromechanical route) in the station of Tavernelle Emilia and the construction of a new building technology and the restructuring of the existing buildings. Square and cabin Tavernelle (BO);
  • Square and cabin locomotive depot of Bologna;
  • Construction of a lock automatically trivialized between the stations of Tavernelle Emilia and Nogara including changing cabins ACEI following the trivialization of the encoding station, laying of km. 100 Funnel with telephone copper and optical fiber;
  • Adaptation to the new rules of the road of 20 level crossings on lines Sassuolo – Guastalla and Reggio Emilia – Ciano d’Enza;
  • Design and implementation of changes related to the Earth Subsystem (SST) of the Train Speed ​​Control System (SCMT) – Phase 2 b – Lot 3 – compartment of Bologna – Bologna line – Ostiglia;
  • Creation of a system SCMT railway line Modena / Suzzara;
  • Adjustments systems ACE train stations of Crevalcore and San Felice sul Panaro;
  • Work to upgrade the railway line Trento / Primolano: adjustment station Villazzano and S. Chiara including: lighting and motive power, signaling and systems TT ;
  • Work on the implementation of the system of support to the Conduct (SSC – SST) on certain sections of the compartment of Florence;
  • Metro area, the design and construction Acei (centralized apparatus electromechanical route) of Bagnolo in Piano and R. Emilia;
  • Accommodation P.R.G. Station Levico (TN) – work “IS, TT, DS;
  • Realization of processing plants of the square for IS and TLC in the new ACS station of Trento.
  • Realization of processing plants of the square for IS and TLC in the new ACS Station Campo Marte (PD);
  • Realisation of machining of the square and cabin for the installation of the remote control and control in the compartment of Verona;
  • Maintenance and signaling equipment in the compartment for RFI Ancona and Verona;
  • Design and implementation of ACEI (centralized apparatus electromechanical route) Mancasale (R. Emilia).